• Triangle No light? Call: 144

Glubokoe Electric Networks

Card image cap

773 человек

Number of Personnel

более 13,5 тыс. км.

Distance

330-35 кВ – 54 шт

Substations

The branch embraces 6 district electric networks. The number and capacity of 330-35 kV substations is 54 pcs. and 598.1 MVA, the number and capacity of 10-0.4 kV substations is 3842 pcs. and 408.721 MVA. 2 hydro power plants. Distance of 330-0.4 kV overhead lines is more than 13.5 thousand km. The branch employs 773 persons.

 

211800, Vitebsk region, Glubokoe, 52 Kalinina str.

Tel: 8 (0215) 62-53-59

Факс: 8 (0215) 62-53-76

E-mail: ges@vitebsk.energo.by

Information
Administrative Procedures
Connection to the Electric Power Supply System