Glubokoe Electric Networks

773 человек
Number of Personnel
более 13,5 тыс. км.
Distance
330-35 кВ – 54 шт
Substations
The branch embraces 6 district electric networks. The number and capacity of 330-35 kV substations is 54 pcs. and 598.1 MVA, the number and capacity of 10-0.4 kV substations is 3842 pcs. and 408.721 MVA. 2 hydro power plants. Distance of 330-0.4 kV overhead lines is more than 13.5 thousand km. The branch employs 773 persons.