• Triangle No light? Call: 144

The reliability of the power system depends on the qualifications and professionalism of the staff

Card image cap

The reliability of the power system depends on the qualifications and professionalism of the staff. Equally important is the cohesion and coherence of the team when performing both planned and emergency recovery work.

The Vitebsk Electric Networks branch pays much attention to staff training and further training. Every month in all structural divisions a single day of technical training is held. In early February, the event was held at the training ground of the Rubovskiy Distribution Zone, where the distribution network operation teams trained their skills in servicing 0.4-10 kV power lines. The personnel demonstrated the level of professional training both in theoretical knowledge and in practical equipment repair and release of the injured person (dummy) from the action of electric current on the 10-kV overhead line.

Information
Administrative Procedures
Connection to the Electric Power Supply System