• Triangle No light? Call: 144

Schedule a planned shutdown of hot water in Polotsk.

Card image cap


Schedule a planned shutdown of hot water in Polotsk.

Starting May 15, the Polotsk TPP branch of RUE Vitebskenergo will begin repair and maintenance work on the heating systems of the regional center. The purpose of the upcoming work is to prepare for the new autumn-winter period. In this regard, a scheduled shutdown of hot water will begin in Polotsk.

From May 15, 2019 to May 29, 2019 , scheduled repair of heating networks will be carried out. In this regard, there will be no hot water supply at the following facilities:

- facilities in the area of ​​all streets from the Kst Republic of Kazakhstan, ul. Marinenko, st. P. Brovka, st. 6th Guards Army, st. Korolenko, st. Turgenev, st. Kleshcheva, st. Dzerzhinsky, the village of Belchitsa.

From June 12, 2019 to June 26, 2019 , scheduled repairs of heating networks will be carried out. In this regard, there will be no hot water supply at the following facilities:

- all objects on the street Y. Kupala, st. Kondratenko, rn Forest Technical School, rn "Dairy", st. Schmidt, st. Komarova, st. Cosmonauts, st. School, microdistrict "Airport-1", "Airport-2", "Airport-3", "Airport-6", district hospital of the Republic of Kazakhstan "Ksty".

From July 17, 2019 to July 31, 2019 , scheduled repairs of heating networks will be carried out. In this regard, there will be no hot water supply at the following facilities:

- all facilities on ul. E. Polotsky (district of pedagogical college, school No. 9), ul. Leningradskaya, st. Sports (wagon depot); st. Yubileinaya, st. Tusnolobovoy-Marchenko (district "Kulneva"), st. Gogol, st. October, st. Communist Ave. F. Skoriny, ul. N. Pokrovskaya (district of the city center).

There will be no hot water supply for residents of these streets during the repair process.

In the days of testing the heating networks, damage to pipelines is not excluded, which can lead to large leaks of network water. At this time, please remove all material values ​​from the basement.

Information
Administrative Procedures
Connection to the Electric Power Supply System